Are batches passing their first inspection?
See whether released batches clear their first quality check, while incomplete inspections stay out of the answer.

A recipe turns questions into decisions.
First it agrees what the question means, then connects only the data it needs, and only then keeps a live answer.
- QuestionThe team agrees what it needs to know.
- Agreed definitionClarifies what counts, the expected level, and who decides.
- Data it needsOnly the minimum data needed to answer is connected.
- Live answerThe answer stays up to date.
- DecisionAct, stay the course, or wait.
What you'll do with the answer
The answer makes the next move clear—and is just as clear when the right move is to wait.
Continue release
The first-pass rate is meeting the quality level the team agreed to protect.
Contain or rework
The rate has fallen below that level, so Quality operations needs to act.
Wait for inspection
Not enough released batches have completed their first inspection yet.
What Soltura needs
Connect each released batch to its first dependable inspection result. The answer describes the production system, not the performance of an individual worker.
Batch released
The production system confirms that a batch was released.
First inspection
The quality system records the first pass or fail result for that batch.
Inspection completed
Batches still waiting for a result do not lower the rate.
A process-level answer
The result supports a production decision without assigning a cause or scoring a worker.
After at least 40 released batches have a first inspection result
Where it fits
A good fit when
- Each released batch has one dependable first-inspection result.
- Quality operations owns the decision to contain, rework, or continue release.
- You need first-pass performance rather than a diagnosis of the cause.
Choose another approach when
- There is no dependable first-inspection result for each released batch.
- You need root-cause analysis, production forecasting, or delivery timeliness.
- You need to score an individual worker.
Bring this answer into your project
Keep first-pass quality visible while there is still time to act.
Soltura prepares the quality question, rate, agreed quality level, and the release and inspection moments your systems need to send. Your project checks the complete change before anything happens.
Nothing changes until your project reviews and approves the proposal.